I just got my crank back from Mark at TCE (A.K.A. CNCguy) and the work looks great. I had the crank snout machined to fit the double timing chain and a new 7X timing wheel fitted onto it.
The next stop will be knife-edging. The final balancing and regrind will come AFTER I get my modified, "H-beam", "small-journel" SBC con-rods back from Mark.
My progress is slow, but Im moving along. Enjoy some engine porn in the meantime
The next stop will be knife-edging. The final balancing and regrind will come AFTER I get my modified, "H-beam", "small-journel" SBC con-rods back from Mark.
My progress is slow, but Im moving along. Enjoy some engine porn in the meantime
Comment